Case Study: Heavy Vehicle Parking and Storage
Storage Lot – 100% Land Utilisation
Houston’s oldest microbrewery had a parking problem. As Saint Arnold’s business has grown, so did their parking needs. The brewery is located near Downtown Houston with limited space. Two expansion lots had serious problems.
Parking lot 1 had old cracked concrete, serious flooding and pooling issues and needed to be replaced. Remediation was needed for contaminated soil under and around the lot from old industrial activity on the site.
Parking lot 2 was to be redesigned to remove torn up asphalt as well as replace some of the green space that was needed for parking. Budget and expensive land made retention/detention and drainage a costly proposition.