The project involved the supply and installation of a new P1512 CDS unit for the Mid Coast Council in NSW.

This work involved decommissioning the existing ECOSOL RSF 41050, making good and constructing a stabilised turf or compacted sandstone access road to be used by the pump out trucks 4 – 6 times per year.

Challenges

Over the years Optimal Stormwater has tried several reinforced turf products for access roads but they haven’t held up to the load of large vacuum trucks, particularly once they are filled with water.

Many councils and facilities owners have experienced service vehicles becoming bogged in soft ground and after rainfall where the grass looks stable but isn’t.

The GPT is to be constructed in a park, although the GPT will have a level straight driveway for the cleaning truck, the preference was to have this area present as a grass surface for consistency with the surrounding area and to reduce any the likelihood of further maintenance cost from the compacted sandstone option. Rectifying the damage can be more costly than the initial service call.

Our Approach

TRUEGRID Pro Plus S Flex 48 was chosen to deliver a drive on surface that allowed the grass to survive and to provide sufficient support to carry the expected load of the Vac trucks. TRUEGRID’s S-Flex technology “gives & takes” with heavy traffic, and heavy loads. This engineered technology takes pressure off the connection points that can separate with rigid or roll-out systems. TRUEGRID’s S-Flex 48 joints allow a TRUEGRID project to perform for the long haul and adapt to the nature of any climate or soil.

Double Wall Hoop Strength-TRUEGRID’s patented four quadrant double wall, hoop strength technology works in unison with the S-Flex joints providing industry best vertical compression strength along with the necessary ability of adjusting to heavy traffic at the surface and natural movement from below.

Implementation

Optimal Stormwater prepared the site by compacting the subgrade and installing a Geofabric layer to keep the prepared Subgrade dry and firm.

For the successful growth of grass a minimum 25mm of loam or other compactable soil material should be placed on the prepared subbase, grass generally likes a minimum of 75mm of sandy loam for healthy growth, this is achieved through the depth of the grid, 48mm, plus 25mm below.

The TRUEGRID Pro Plus S Flex 48 is then laid and cut to size, the soil is then placed on the grid itself to be level with the top of the grid. Turf is then laid and rolled to make flat.

In this project White Superspots have been added to highlight the reinforced area of grass for easy identification by the service vehicles.

    Outcome

    Optimal Stormwater have delivered a reinforced grass accessway using TRUEGRID that will last 40+ years in the ground, remains permeable and lowers the UHI effect. More importantly it keeps the look and  feel of grass whilst preventing service vehicles from getting bogged.

    Why choose

    TRUEGRID Pro Plus S Flex 48?

    TRUEGRID Pro Plus S Flex 48 is the only permeable paver specifically engineered for commercial development and industrial-grade parking lots that can handle heavy loads, and high traffic and maximise land utilisation.

    ● 100% Permeable Paver
    ● 100% Post-Industrial Recycled HDPE
    ● S-Flex prevent cracking with the movement of soils and change in seasons
    ● X anchors leverage gravel to anchor grid
    ● Rated 25 tonne per axle
    ● Deep cells eliminate gravel migration
    ● Works with SuperSpot Parking Markers
    ● 40 + years, virtually maintenance-free

    Learn More